Cable Suspension Footbridge – Hallet Cove
Project Overview
This project involved high stakes, high terrain, and the high level of capability delivered by J. Furphy & Sons Group. It required the galvanizing of two cable suspension footbridges at Grey Road Gully and Kurnabinna Gully along the Marion Coastal Park walkway at Hallet Cove SA. The bridges were designed to provide safe pedestrian access across steep coastal terrain and required a durable corrosion protection system suited to one of the harshest marine environment compliance levels. The result produced a long-life, low-maintenance solution that enhances connectivity, safety, and has enhanced the visitor experience along this popular coastal trail.


The Challenge
Terrain, environment, design life requirements, and structural component sizes all posed challenges throughout this project. The bridges are located in a highly corrosive coastal C5 environment, requiring maximum long-term protection against salt and humidity. Steep, rugged terrain and fractured rock created significant installation and access challenges for construction teams installing the large structural components that called for precise detailing to ensure effective venting and draining for safe galvanizing. The bridges also needed extremely reliable design life, including 100-year foundations and 50-year structural durability.
Our Solution
Full corrosion protection to meet C5 coastal environment and AS/NZS 4680 compliance was applied to 16.5 tonnes of structural steel, including towers, decking, balustrades, and bracing rods, using our signature hot dip galvanizing process. We collaborated early with the steel detailer which helped to ensure best-practice venting and drainage design, allowing safe, efficient processing and a high-quality finish to last the required lifespan. The modular bridge design enabled efficient fabrication, galvanizing, transport, and installation, supporting project timelines and constructability, and reducing costly delays.

Technical Specifications
40 metre span (each)
16.5 tonnes
Steel
Hot dip galvanized
AS/NZS 4680
- Suspension design
- Design lifespan including 100-year foundations and 50-year structural durability
The Outcome
This highly successful project delivered:
- A durable, corrosion-resistant structure designed for long-term coastal performance
- Significant lifecycle cost savings, with galvanizing providing up to 55% savings compared to alternative coating systems.
- A safe and accessible route for pedestrians, improving connectivity along a 7.2km coastal walkway
- Enhanced visual appeal of the landscape, with the structures blending seamlessly into the natural environment
- Supported sustainable infrastructure through reduced maintenance, recyclability, and long service life.